翻訳と辞書
Words near each other
・ Kelan Luker
・ Kelana Jaya
・ Kelana Jaya Line
・ Kelana Jaya LRT Station
・ Kelana language
・ Keland House
・ Kelane
・ Kelanen
・ Kelang
・ Kelanga, Bhiwani
・ Kelani River
・ Kelani River-Peliyagoda Waterdrome
・ Kelani Tissa
・ Kelani Valley Club
・ Kelani Valley Line
Kelanitissa Power Station
・ Kelaniya
・ Kelaniya Divisional Secretariat
・ Kelaniya Electoral District
・ Kelaniya Raja Maha Vihara
・ Kelanlu
・ Kelanlu, northern Ararat
・ Kelanlu, southern Ararat
・ Kelanly
・ Kelanoa
・ Kelanoa Harbour
・ Kelantan
・ Kelantan FA
・ Kelantan keping
・ Kelantan rebellion


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Kelanitissa Power Station : ウィキペディア英語版
Kelanitissa Power Station

The Kelanitissa Power Station is a power generation complex consisting of two separately owned facilities, located on the south bank of the Kelani River in the northern part of the city of Colombo, Sri Lanka. The entire power facility is capable of producing a total of of power at a given time, a significant amount when compared to the total installed capacity of nearly in the year 2014.〔(【引用サイトリンク】url=http://www.ceb.lk/sub/publications/statistical.aspx )
==AES Kelanitissa Power Station==
The privately owned facility, known as the AES Kelanitissa Power Station, is a diesel fuel fired combined cycle power station.〔 It is owned by AES Kelanitissa Private Limited, a subsidiary of AES Corporation. It consists of three generation units. Unit-1 is a GEPG9171E gas turbine with a nominal output of , while Unit-2 is a steam turbine manufactured by Bharat Heavy Electricals Limited. The third unit is a CMI-certified Larsen & Toubro-designed and Doosan Babcock manufactured LTC heat recovery steam turbine. Construction works were done by Larsen & Toubro.
The private facility began combined-cycle operations in the and since September 2005 it runs in combined-cycle mode. Like all power stations in Sri Lanka, power generated by the power station are sold to the Ceylon Electricity Board under a 20-year take-or-pay power purchase agreement. The low-sulfur diesel is supplied through an existing pipeline by the Ceylon Petroleum Corporation, with 20,000 tons, or the equivalent of 28-days of full capacity operations, stored in case of any fuel shortage. The plant is currently running on a 20-year contract, which ends on October 10, 2023.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Kelanitissa Power Station」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.